Home / Products / IED Checker
Test suite · server side · clause 10

IED Checker — IEC 61850 server conformance test suite

Every MMS server test case in IEC 61850 clause 10, run exhaustively against your device.

The conformance tester for devices that serve 61850. It takes the published clause 10 MMS server test cases, adds error and limit scenarios that break naive implementations, and produces a report you can put in front of a customer, a type-approval body or your own firmware team.

IED Checker
Purpose
Type-approval testing, project acceptance, protocol regression for firmware changes
Coverage
All clause 10 MMS server test cases; extensible with custom cases
Method
Exhaustive — detailed enough to be used for engineering fault-finding, not just pass/fail
Output
Word, Excel and PDF reports; customisable templates
Automation
Scripted test language; test-case creation and template management
Delivery
Licensed software; remote or on-site conformance service available

Service areas covered

  • Association service
  • Directory service
  • Data set service — all functions
  • Buffered reporting — all capabilities
  • Unbuffered reporting — all capabilities
  • Logging — all capabilities
  • Setting groups — all functions, including single set-point
  • Control service
  • File service
  • Read/write, including multiple read and multiple write
  • Substitution service
  • Time synchronisation

Scenario testing

Two scenario families separate products that pass a happy-path demo from products that survive a real substation. Error scenarios cover parameter errors, operations on invalid objects, type errors, out-of-range values and abnormal termination. Limit scenarios push the device to its stated maxima: read/write responses per second, reports processed per second, and log storage capacity, so the numbers in the datasheet get verified rather than assumed.

  • Reports in Word, Excel or PDF, with customisable templates
  • Scripted test language for repeatable runs after each firmware build
  • Custom cases can be added to the test collection and managed as templates

Capability summary

CapabilityStatus
Clause 10 MMS server test casesAll covered
Custom test cases added to the collectionSupported
Error scenario simulationSupported
Limit scenario simulationSupported
Test template customisation and managementSupported
Report generation (Word / Excel / PDF)Supported
Scripted test languageSupported

Published capability list for the product.

Frequently asked

Is this the same engine as your SDK?

It is the same protocol kernel in the opposite role, which is why a device built on our SDK usually passes early runs — and why a device with a genuine deviation shows it immediately.

Can you run the test for us?

Yes, remote or on-site conformance testing is offered as a service with a per-clause report. Many teams use this before buying a licence, to establish the current state of their device.

Do we need a 61850 expert to operate it?

No. Test cases are pre-built and grouped by service; the scripted language is only needed when you want to automate a regression suite.

Related reading

Decision guide

Commercial IEC 61850 SDK vs open source: what you are actually buying

Both options work in a lab. The difference shows up at type approval, on VxWorks, and the first time a third-party maste…

Protocols

GOOSE publish/subscribe: timing, VLANs, and what breaks first

How GOOSE retransmission actually works, why the first thing to break is usually the network rather than the stack, and …

Protocols

IEC 61850 control models: direct versus select-before-operate, and what gets tested

What the five control models mean in practice, how origin and test flags change behaviour, how command termination shoul…

Related

Substation Checker

Simulate one IED or two hundred, then see whether your master station keeps up.

SSD Studio

Draw the primary single-line diagram; get a valid IEC 61850 SSD model out of the same file.

Ask about IED Checker

Tell us the platform, the protocols and the acceptance criteria. We will answer with what the licence covers and what the integration effort looks like — not with a brochure.